Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Plastic color masterbatch pelletizing
1. What service do we provide?
Perfect service system:
1.We will provide the Feasibility Analysis Report for your project.
2.We will provide the model selection and technical parameter of our machinery.
3.We will provide the design for the plant and electric power accounting for the facilities.
4.We will provide the design for plastic formula according to the products requirement.
5.We will provide the technology of plastic product surface treatment if need.
6.We will provide technique training for your operator.
7.We will provide solution for the production problem .
8.We will install and test the machine in customer's factory.
9.We will provide turnkey project to customers.
2. Payment terms
30% of the total contract value should be paid in advance(by T/T). 70% of the total contract value is to be paid upon the inspection and acceptance of the machine by the Buyer at the Seller's factory(by T/T).
3. Delivery terms:
When the contract becomes valid, the machine should be delivered in 60 days since receipt of the advance payment (the delivery date is the date on the shipment voucher, excluding the period of transportation). And the equipment will be in normal operation after debugging within two weeks after arrival.
4. Warranty terms:
Guarantee for one year (excluding human factor and wearing parts) warranty, begins at time of start up at factory site of customer.
5. Inspection :
After the machine is completed, the seller should notify the buyer to inspect before delivery, and the seller guarantees that all the goods sold are of good quality. The seller does not bear the material cost of the machine inspection in the seller's factory. The buyer should come to the seller's factory for inspection.
6. Installation and equipment debugging:
If the buyer needs it, the seller should send a team of technicians to the buyer's factory for full-line operation of installation and testing, and the buyer should lift the price of the entire food/location and group purchase information (aircraft, food, hotel, etc.), and charge the engineer 150 USD/day/engineer's cost.